BNWAS Installation Schedule

NEWSTIME: 2020-09-27

BNWAS Installation Schedule for International Navigation Ships

Ships Category

Specifications (GT)

Installation Deadline

New shipbuildings

on and after July 1, 2011

All passenger ships

The time of shipbuilding

Ships of 150 GT and above

Ships built before July 1, 2011

All passenger ships

No later than the annual inspection

for the first time after 1 July 1, 2012

Ships of 3000 GT and above

Ships of 500 GT and upwards to 3000 GT

No later than the annual inspection

for the first time after 1 July 1, 2013

Ships of 150 GT and upwards to 500 GT

No later than the annual inspection

for the first time after 1 July 1, 2014